Here is what you get with Architecture Engineering Consultant UAE
Many of the Architecture engineering consultants UAE offer a wide variety of comprehensive service that has been further broken into several phases. Different consultants use a different number of steps with slightly different names, but eventually, all of the Architect Consultant Firm In Sharjah generally fall to offer maximum five or six main categories of services. Below we will be describing the main services that these consultants in the general offer.
This is also being referred to as
Preliminary Design, Initial Consultation, and Design, or Building Program &
Site Analysis, among other things. It includes the initial visits wherein the
architect analyzes the site and gathers information regarding client
requirements. He needs to develop a detailed “program”, a written statement
of your needs and design goals. After that, the architect will come up
with key concepts and rough sketches showing the size, general layout, and
appearance of the building and how it fits into the building site.
Design development
Once the schematic design has been
approved, its time to turn a rough concept into a real building design
along with floor plans, a roof design, and some of the interior and
exterior trims and details. This usually includes some of the scale drawings, a
basic structural plan, and basic specifications for the main components of the
building.
Construction documents
Detailed drawings or blueprints and
written specifications or specs are required to be maintained here. These
detailed drawings are then also required to obtain a building permit. Some of
these plans and specs are very precise and highly detailed. Here the architect
has to go through every little issue that contractor might face.
Bidding or Negotiation
The architect also helps you to
postulate bids from a list of qualified contractors for the project. The
architect will carefully answer all the contractor questions to clarify items
in the plans or specs. Sometimes they even make revisions to the plans or specs
and may negotiate with one or more of the contractors if required.
Construction Administration
It is kind of supervision that
ensures that the builder and subcontractors are following the plans and
specifications (there’s always room for interpretation) without any deviation.
In the construction phase, the contractor will also make a weekly visit to the
site, to inspect the work in progress. Construction administration may also
include
●
Preparing
any additional detailed drawings if required
●
Approving
the contractor’s requests for progress payments
●
Approving
any modifications to the plans and preparing any required change orders
Negotiating who should pay for disputed change
order